{"componentChunkName":"component---src-templates-project-js","path":"/projects/bc-berth/","result":{"data":{"wordpressWpSettings":{"title":"Fortec","wordpressUrl":"https://wp.fortec.com.au","siteUrl":"https://www.fortec.com.au"},"siteSettings":{"options":{"customCss":""}},"categories":{"nodes":[{"name":"Building","slug":"building","path":"/project-category/building/","count":5,"wordpress_id":40,"wordpress_parent":92},{"name":"Post Tensioning","slug":"post-tensioning","path":"/project-category/post-tensioning/","count":13,"wordpress_id":46,"wordpress_parent":44},{"name":"Project Category","slug":"project-category","path":"/project-category/project-category/","count":1,"wordpress_id":6,"wordpress_parent":0},{"name":"Sector","slug":"sector","path":"/project-category/sector/","count":0,"wordpress_id":92,"wordpress_parent":0},{"name":"Services","slug":"services","path":"/project-category/services/","count":0,"wordpress_id":44,"wordpress_parent":0},{"name":"Bridges","slug":"bridges","path":"/project-category/bridges/","count":26,"wordpress_id":110,"wordpress_parent":44},{"name":"Geotechnical","slug":"geotechnical","path":"/project-category/geotechnical/","count":20,"wordpress_id":109,"wordpress_parent":44},{"name":"Resources","slug":"resources","path":"/project-category/resources/","count":12,"wordpress_id":38,"wordpress_parent":92},{"name":"Infrastructure","slug":"infrastructure","path":"/project-category/infrastructure/","count":44,"wordpress_id":37,"wordpress_parent":92},{"name":"Remediation","slug":"remediation","path":"/project-category/remediation/","count":3,"wordpress_id":111,"wordpress_parent":44}]},"wordpressPost":{"id":"2ca3f296-f7d1-5613-9cef-f0f94e2ba8de","title":"B Shed/B &#038; C Berth Deck Replacement &#038; B Shed Services Upgrade Works","slug":"bc-berth","content":"","excerpt":"","wordpress_id":6163,"date":"April 2nd 2026","featured_media":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-5.jpg","localFile":{"childImageSharp":{"fluid":{"aspectRatio":1.7741935483870968,"src":"/static/05a39a2590d24e4791029f2f8371d3c2/90032/Fortec_BC-Berth-5.jpg","srcSet":"/static/05a39a2590d24e4791029f2f8371d3c2/a9d2c/Fortec_BC-Berth-5.jpg 275w,\n/static/05a39a2590d24e4791029f2f8371d3c2/f8c88/Fortec_BC-Berth-5.jpg 550w,\n/static/05a39a2590d24e4791029f2f8371d3c2/90032/Fortec_BC-Berth-5.jpg 1100w,\n/static/05a39a2590d24e4791029f2f8371d3c2/041cc/Fortec_BC-Berth-5.jpg 1366w","sizes":"(max-width: 1100px) 100vw, 1100px"}}}},"acf":{"project_client":"Fremantle Ports","project_pdf":null,"project_location":"Fremantle, WA","project_scale":"Medium","year_of_completion":"2026","layout":[{"__typename":"WordPressAcf_postInformation","id":"2ca3f296-f7d1-5613-9cef-f0f94e2ba8de0layoutWordPressAcf_postInformation","bannerImage":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-5.jpg","title":"Fortec_B&#038;C Berth 5"},"postDescription":"The project involves demolition and replacement of sections of the existing berth deck and superstructure."},{"__typename":"WordPressAcf_ProjectOverview","projectIntro":"<p>Fortec was engaged by Fremantle Ports for the B Shed and B &amp; C Berth Deck Replacement and B Shed Services Upgrade Works. The project involves demolition and replacement of sections of the existing berth deck and superstructure, including pile repairs and concrete deck replacement, to extend the service life and improve the structural capacity of the facility.</p>\n<p>The works have been developed to achieve a minimum design life of 25 years, with deck load ratings of Class 15 for the B and C Berth deck replacement and Class 10 for the B Shed deck replacement. The approach prioritises the reuse of existing supporting piles and structural elements where practicable.</p>\n","projectFacts":[{"label":"CLIENT","content":"Fremantle Ports"},{"label":"LOCATION","content":"Fremantle, WA"},{"label":"YEAR OF COMPLETION","content":"2026"}],"additionalContent":[{"heading":"","image":{"title":"Fortec_B&#038;C Berth 6","source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-6.jpg","localFile":{"childImageSharp":{"fluid":{"base64":"data:image/jpeg;base64,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","aspectRatio":1.7692307692307692,"src":"/static/ae8d69d624e0272b72d6ba832f2a01bd/d931e/Fortec_BC-Berth-6.jpg","srcSet":"/static/ae8d69d624e0272b72d6ba832f2a01bd/7f2c3/Fortec_BC-Berth-6.jpg 138w,\n/static/ae8d69d624e0272b72d6ba832f2a01bd/c46ca/Fortec_BC-Berth-6.jpg 275w,\n/static/ae8d69d624e0272b72d6ba832f2a01bd/d931e/Fortec_BC-Berth-6.jpg 550w,\n/static/ae8d69d624e0272b72d6ba832f2a01bd/af3c4/Fortec_BC-Berth-6.jpg 825w,\n/static/ae8d69d624e0272b72d6ba832f2a01bd/25999/Fortec_BC-Berth-6.jpg 1100w,\n/static/ae8d69d624e0272b72d6ba832f2a01bd/99c4f/Fortec_BC-Berth-6.jpg 1366w","sizes":"(max-width: 550px) 100vw, 550px"}}}},"column1":"<h2>Scope of Works</h2>\n<ul>\n<li>Temporary relocation, protection and reinstatement of services, including removal of redundant services (water, stormwater, electrical and security).</li>\n<li>Removal of under-berth catwalks.</li>\n<li>Removal of fixings and obstacles.</li>\n<li>Demolition of sections of the superstructure and concrete deck to allow access for screw pilling rig.</li>\n<li>Deck superstructure works including halfcap strengthening, stringer replacement, and corbel replacement.</li>\n<li>Installation of screw piles.</li>\n<li>Concrete pile works including pile repair and removal of redundant piles.</li>\n<li>Removal of remaining concrete deck sections to be replaced, retaining existing stringers where suitable.</li>\n<li>Installation of Permadec GRP deck formwork, placement of reinforcement and establishment of fixity between stringers and deck.</li>\n<li>Cast concrete deck replacement.</li>\n<li>Replacement of bollards.</li>\n<li>Maintenance of temporary public access to O’Connor Landing for the duration of the works.</li>\n</ul>\n","column2":"<h2>Key Points of Interest</h2>\n<ul>\n<li>The project involved a range of construction works, including concrete pile refurbishment, timber stringer replacement, steel beam installation, additional pile installation, and the removal of the hybrid timber–concrete–asphalt deck for replacement with a new reinforced concrete deck. It highlights Fortec’s capabilities in working with timber, concrete, and steel structures.</li>\n</ul>\n<h2>Challenges and Outcomes</h2>\n<ul>\n<li>Working around tidal movements.</li>\n<li>Maintaining ferry operations at O’Connor Landing throughout the works.</li>\n<li>Managing high public interaction and traffic.</li>\n</ul>\n"}]},{"__typename":"WordPressAcf_FullWidthCarousel","images":[{"image":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-5.jpg","localFile":{"publicURL":"/static/05a39a2590d24e4791029f2f8371d3c2/Fortec_BC-Berth-5.jpg","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/05a39a2590d24e4791029f2f8371d3c2/2f1b1/Fortec_BC-Berth-5.jpg","srcSet":"/static/05a39a2590d24e4791029f2f8371d3c2/fd013/Fortec_BC-Berth-5.jpg 200w,\n/static/05a39a2590d24e4791029f2f8371d3c2/25252/Fortec_BC-Berth-5.jpg 400w,\n/static/05a39a2590d24e4791029f2f8371d3c2/2f1b1/Fortec_BC-Berth-5.jpg 800w,\n/static/05a39a2590d24e4791029f2f8371d3c2/0ff54/Fortec_BC-Berth-5.jpg 1200w,\n/static/05a39a2590d24e4791029f2f8371d3c2/99c4f/Fortec_BC-Berth-5.jpg 1366w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-3.jpg","localFile":{"publicURL":"/static/a67870cf9abc2cce842d6b8cac2455ac/Fortec_BC-Berth-3.jpg","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/a67870cf9abc2cce842d6b8cac2455ac/2f1b1/Fortec_BC-Berth-3.jpg","srcSet":"/static/a67870cf9abc2cce842d6b8cac2455ac/fd013/Fortec_BC-Berth-3.jpg 200w,\n/static/a67870cf9abc2cce842d6b8cac2455ac/25252/Fortec_BC-Berth-3.jpg 400w,\n/static/a67870cf9abc2cce842d6b8cac2455ac/2f1b1/Fortec_BC-Berth-3.jpg 800w,\n/static/a67870cf9abc2cce842d6b8cac2455ac/0ff54/Fortec_BC-Berth-3.jpg 1200w,\n/static/a67870cf9abc2cce842d6b8cac2455ac/99c4f/Fortec_BC-Berth-3.jpg 1366w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-4.jpg","localFile":{"publicURL":"/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/Fortec_BC-Berth-4.jpg","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/2f1b1/Fortec_BC-Berth-4.jpg","srcSet":"/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/fd013/Fortec_BC-Berth-4.jpg 200w,\n/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/25252/Fortec_BC-Berth-4.jpg 400w,\n/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/2f1b1/Fortec_BC-Berth-4.jpg 800w,\n/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/0ff54/Fortec_BC-Berth-4.jpg 1200w,\n/static/1b9ec2cfb3cbb78f233fa521f8ede1b7/99c4f/Fortec_BC-Berth-4.jpg 1366w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-1.jpg","localFile":{"publicURL":"/static/33f30535c6fadc5dc0d97e218e9e7bb3/Fortec_BC-Berth-1.jpg","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/33f30535c6fadc5dc0d97e218e9e7bb3/2f1b1/Fortec_BC-Berth-1.jpg","srcSet":"/static/33f30535c6fadc5dc0d97e218e9e7bb3/fd013/Fortec_BC-Berth-1.jpg 200w,\n/static/33f30535c6fadc5dc0d97e218e9e7bb3/25252/Fortec_BC-Berth-1.jpg 400w,\n/static/33f30535c6fadc5dc0d97e218e9e7bb3/2f1b1/Fortec_BC-Berth-1.jpg 800w,\n/static/33f30535c6fadc5dc0d97e218e9e7bb3/0ff54/Fortec_BC-Berth-1.jpg 1200w,\n/static/33f30535c6fadc5dc0d97e218e9e7bb3/99c4f/Fortec_BC-Berth-1.jpg 1366w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/04/Fortec_BC-Berth-2.jpg","localFile":{"publicURL":"/static/0b0ae45a3012474fda2f51d37229181c/Fortec_BC-Berth-2.jpg","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/0b0ae45a3012474fda2f51d37229181c/2f1b1/Fortec_BC-Berth-2.jpg","srcSet":"/static/0b0ae45a3012474fda2f51d37229181c/fd013/Fortec_BC-Berth-2.jpg 200w,\n/static/0b0ae45a3012474fda2f51d37229181c/25252/Fortec_BC-Berth-2.jpg 400w,\n/static/0b0ae45a3012474fda2f51d37229181c/2f1b1/Fortec_BC-Berth-2.jpg 800w,\n/static/0b0ae45a3012474fda2f51d37229181c/0ff54/Fortec_BC-Berth-2.jpg 1200w,\n/static/0b0ae45a3012474fda2f51d37229181c/99c4f/Fortec_BC-Berth-2.jpg 1366w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}]}]},"project_category":[37,111],"yoast":{"metaTitle":"B Shed/B&C Berth Deck Replacement %%page%% %%sep%% %%sitename%%","metaDescription":"The project involves demolition and replacement of sections of the existing berth deck and superstructure to extend the service life","opengraph_image":{"source_url":""},"twitter_image":{"source_url":""}}}},"pageContext":{"id":"2ca3f296-f7d1-5613-9cef-f0f94e2ba8de","noindex":false}},"staticQueryHashes":["1504607225","2568767299","3041280590","304281037","3138431152","3602273234","3820327877","3820327877","617399","861822871"]}