{"componentChunkName":"component---src-templates-project-js","path":"/projects/wellington-dam-geotechnical/","result":{"data":{"wordpressWpSettings":{"title":"Fortec","wordpressUrl":"https://wp.fortec.com.au","siteUrl":"https://www.fortec.com.au"},"siteSettings":{"options":{"customCss":""}},"categories":{"nodes":[{"name":"Project Category","slug":"project-category","path":"/project-category/project-category/","count":1,"wordpress_id":6,"wordpress_parent":0},{"name":"Sector","slug":"sector","path":"/project-category/sector/","count":0,"wordpress_id":92,"wordpress_parent":0},{"name":"Services","slug":"services","path":"/project-category/services/","count":0,"wordpress_id":44,"wordpress_parent":0},{"name":"Resources","slug":"resources","path":"/project-category/resources/","count":12,"wordpress_id":38,"wordpress_parent":92},{"name":"Bridges","slug":"bridges","path":"/project-category/bridges/","count":27,"wordpress_id":110,"wordpress_parent":44},{"name":"Building","slug":"building","path":"/project-category/building/","count":6,"wordpress_id":40,"wordpress_parent":92},{"name":"Post Tensioning","slug":"post-tensioning","path":"/project-category/post-tensioning/","count":14,"wordpress_id":46,"wordpress_parent":44},{"name":"Remediation","slug":"remediation","path":"/project-category/remediation/","count":7,"wordpress_id":111,"wordpress_parent":44},{"name":"Geotechnical","slug":"geotechnical","path":"/project-category/geotechnical/","count":21,"wordpress_id":109,"wordpress_parent":44},{"name":"Infrastructure","slug":"infrastructure","path":"/project-category/infrastructure/","count":46,"wordpress_id":37,"wordpress_parent":92}]},"wordpressPost":{"id":"2def0d09-e6a5-519e-9526-48ffdfa540c3","title":"Wellington Dam","slug":"wellington-dam-geotechnical","content":"","excerpt":"","wordpress_id":6267,"date":"June 2nd 2026","featured_media":{"source_url":"/wp-content/uploads/2026/06/Wellington-Dam.jpg","localFile":{"childImageSharp":{"fluid":{"aspectRatio":1.4945652173913044,"src":"/static/53490a7bfa4a6b1017b21b4f2d813c3c/56937/Wellington-Dam.jpg","srcSet":"/static/53490a7bfa4a6b1017b21b4f2d813c3c/a9d2c/Wellington-Dam.jpg 275w,\n/static/53490a7bfa4a6b1017b21b4f2d813c3c/f8c88/Wellington-Dam.jpg 550w,\n/static/53490a7bfa4a6b1017b21b4f2d813c3c/56937/Wellington-Dam.jpg 773w","sizes":"(max-width: 773px) 100vw, 773px"}}}},"acf":{"project_client":"Seymour Whyte Constructions (Water Corporation Asset)","project_pdf":null,"project_location":"Worsley, WA","project_scale":"Large","year_of_completion":"2025","layout":[{"__typename":"WordPressAcf_postInformation","id":"2def0d09-e6a5-519e-9526-48ffdfa540c30layoutWordPressAcf_postInformation","bannerImage":{"source_url":"/wp-content/uploads/2026/06/Wellington-Dam.jpg","title":"Wellington Dam"},"postDescription":"Supply, installation, stressing and testing of 56 No 1000kN WL active permanent anchors at Wellington Dam."},{"__typename":"WordPressAcf_ProjectOverview","projectIntro":"<p>Fortec was engaged by Seymour Whyte Constructions to deliver the supply, installation, stressing and testing of 56 No 1000kN WL active permanent anchors at<br />\nWellington Dam.</p>\n<p>56 No Permanent Anchors installed using DHH drilling 178mm dia including fabrication, waterproof grouting, testing and stressing. Permanent anchors were<br />\ninstalled in hard rock strata overcoming subterranean ground water flow utilising Fortec owned tight access drilling equipment.</p>\n<p>The permanent anchors are an integral part of a new foundation systems within the Dam spillway/water course.</p>\n<p>Fortec works were completed incident free in surrounding sensitive natural environments and known indigenous heritage assets with Fortec owned specialist tight access plant and equipment maintaining a safe and functional work environment.</p>\n<p>Fortec delivered our scope ahead of the forecast delivery program for the Client.</p>\n","projectFacts":[{"label":"CLIENT","content":"Seymour Whyte Constructions (Water Corporation Asset)"},{"label":"LOCATION","content":"Worsley, WA"},{"label":"YEAR OF COMPLETION","content":"2025"}],"additionalContent":[{"heading":"","image":{"title":"Fortec_Wellington Dam 3","source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-3.jpg","localFile":{"childImageSharp":{"fluid":{"base64":"data:image/jpeg;base64,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","aspectRatio":1.3269230769230769,"src":"/static/4be77523626b13d218493afa2d7ce46d/d931e/Fortec_Wellington-Dam-3.jpg","srcSet":"/static/4be77523626b13d218493afa2d7ce46d/7f2c3/Fortec_Wellington-Dam-3.jpg 138w,\n/static/4be77523626b13d218493afa2d7ce46d/c46ca/Fortec_Wellington-Dam-3.jpg 275w,\n/static/4be77523626b13d218493afa2d7ce46d/d931e/Fortec_Wellington-Dam-3.jpg 550w,\n/static/4be77523626b13d218493afa2d7ce46d/af3c4/Fortec_Wellington-Dam-3.jpg 825w,\n/static/4be77523626b13d218493afa2d7ce46d/25999/Fortec_Wellington-Dam-3.jpg 1100w,\n/static/4be77523626b13d218493afa2d7ce46d/5f7bf/Fortec_Wellington-Dam-3.jpg 4032w","sizes":"(max-width: 550px) 100vw, 550px"}}}},"column1":"<h2>Scope of Works</h2>\n<ul>\n<li>Early Fortec involvement provided optimised design, construction and access solutions for the Client and End user.</li>\n<li>Supply, drilling, installation and stressing of 56 No permanent ground anchors.</li>\n<li>Supply and installation of pressure grouted ground anchors were installed in hard rock strata overcoming subterranean ground water flow.</li>\n</ul>\n<p>&nbsp;</p>\n<h2>Key Points of Interest</h2>\n<ul>\n<li>56 No Permanent Active anchors were carried out efficiently and remained LTI and NCR free.</li>\n<li>The project was completed early and to client satisfaction.</li>\n<li>Completed safely in an operational work environment with no disruption to water supply to downstream users.</li>\n</ul>\n","column2":""}]},{"__typename":"WordPressAcf_FullWidthCarousel","images":[{"image":{"source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-4.jpg","localFile":{"publicURL":"/static/e7174c089a4056ff8fd6597a9cbc4e1e/Fortec_Wellington-Dam-4.jpg","childImageSharp":{"fluid":{"aspectRatio":1.3333333333333333,"src":"/static/e7174c089a4056ff8fd6597a9cbc4e1e/2f1b1/Fortec_Wellington-Dam-4.jpg","srcSet":"/static/e7174c089a4056ff8fd6597a9cbc4e1e/fd013/Fortec_Wellington-Dam-4.jpg 200w,\n/static/e7174c089a4056ff8fd6597a9cbc4e1e/25252/Fortec_Wellington-Dam-4.jpg 400w,\n/static/e7174c089a4056ff8fd6597a9cbc4e1e/2f1b1/Fortec_Wellington-Dam-4.jpg 800w,\n/static/e7174c089a4056ff8fd6597a9cbc4e1e/0ff54/Fortec_Wellington-Dam-4.jpg 1200w,\n/static/e7174c089a4056ff8fd6597a9cbc4e1e/06655/Fortec_Wellington-Dam-4.jpg 1600w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-5.jpg","localFile":{"publicURL":"/static/77fba4c74c65f41c8c20dc2a699a41bd/Fortec_Wellington-Dam-5.jpg","childImageSharp":{"fluid":{"aspectRatio":0.7490636704119851,"src":"/static/77fba4c74c65f41c8c20dc2a699a41bd/2f1b1/Fortec_Wellington-Dam-5.jpg","srcSet":"/static/77fba4c74c65f41c8c20dc2a699a41bd/fd013/Fortec_Wellington-Dam-5.jpg 200w,\n/static/77fba4c74c65f41c8c20dc2a699a41bd/25252/Fortec_Wellington-Dam-5.jpg 400w,\n/static/77fba4c74c65f41c8c20dc2a699a41bd/2f1b1/Fortec_Wellington-Dam-5.jpg 800w,\n/static/77fba4c74c65f41c8c20dc2a699a41bd/0ff54/Fortec_Wellington-Dam-5.jpg 1200w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-2.jpg","localFile":{"publicURL":"/static/668d7bdad7cbce759619436e141e24a3/Fortec_Wellington-Dam-2.jpg","childImageSharp":{"fluid":{"aspectRatio":0.7490636704119851,"src":"/static/668d7bdad7cbce759619436e141e24a3/cbc80/Fortec_Wellington-Dam-2.jpg","srcSet":"/static/668d7bdad7cbce759619436e141e24a3/fd013/Fortec_Wellington-Dam-2.jpg 200w,\n/static/668d7bdad7cbce759619436e141e24a3/25252/Fortec_Wellington-Dam-2.jpg 400w,\n/static/668d7bdad7cbce759619436e141e24a3/cbc80/Fortec_Wellington-Dam-2.jpg 531w","sizes":"(max-width: 531px) 100vw, 531px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-6.jpg","localFile":{"publicURL":"/static/85aacfae1c4dc774574cff88368c9b51/Fortec_Wellington-Dam-6.jpg","childImageSharp":{"fluid":{"aspectRatio":0.7490636704119851,"src":"/static/85aacfae1c4dc774574cff88368c9b51/2f1b1/Fortec_Wellington-Dam-6.jpg","srcSet":"/static/85aacfae1c4dc774574cff88368c9b51/fd013/Fortec_Wellington-Dam-6.jpg 200w,\n/static/85aacfae1c4dc774574cff88368c9b51/25252/Fortec_Wellington-Dam-6.jpg 400w,\n/static/85aacfae1c4dc774574cff88368c9b51/2f1b1/Fortec_Wellington-Dam-6.jpg 800w,\n/static/85aacfae1c4dc774574cff88368c9b51/0ff54/Fortec_Wellington-Dam-6.jpg 1200w","sizes":"(max-width: 800px) 100vw, 800px"}}}}},{"image":{"source_url":"/wp-content/uploads/2026/06/Fortec_Wellington-Dam-3.jpg","localFile":{"publicURL":"/static/4be77523626b13d218493afa2d7ce46d/Fortec_Wellington-Dam-3.jpg","childImageSharp":{"fluid":{"aspectRatio":1.3333333333333333,"src":"/static/4be77523626b13d218493afa2d7ce46d/2f1b1/Fortec_Wellington-Dam-3.jpg","srcSet":"/static/4be77523626b13d218493afa2d7ce46d/fd013/Fortec_Wellington-Dam-3.jpg 200w,\n/static/4be77523626b13d218493afa2d7ce46d/25252/Fortec_Wellington-Dam-3.jpg 400w,\n/static/4be77523626b13d218493afa2d7ce46d/2f1b1/Fortec_Wellington-Dam-3.jpg 800w,\n/static/4be77523626b13d218493afa2d7ce46d/0ff54/Fortec_Wellington-Dam-3.jpg 1200w,\n/static/4be77523626b13d218493afa2d7ce46d/06655/Fortec_Wellington-Dam-3.jpg 1600w,\n/static/4be77523626b13d218493afa2d7ce46d/5f7bf/Fortec_Wellington-Dam-3.jpg 4032w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}]}]},"project_category":[109,37],"yoast":{"metaTitle":"%%title%% %%page%% %%sep%% %%sitename%% %%sep%% Geotechnical","metaDescription":"Supply, installation, stressing and testing of 56 No 1000kN WL active permanent anchors. Including fabrication and waterproof grouting.","opengraph_image":{"source_url":""},"twitter_image":{"source_url":""}}}},"pageContext":{"id":"2def0d09-e6a5-519e-9526-48ffdfa540c3","noindex":false}},"staticQueryHashes":["1504607225","2568767299","3041280590","304281037","3138431152","3602273234","3820327877","3820327877","617399","861822871"]}