Fortec was engaged to perform post-mining rehabilitation works on the Upper Canal near Appin.
The 120 year old heritage listed structure conveys bulk water from the Nepean and Avon Dams to Prospect Reservoir in Sydney’s west.
The canal consists of open channels sections, tunnels, aqueducts and various other associated components.
Due to mining operations in the vicinity, minor damage occurred to the aqueduct infrastructure and the canal.
Fortec was contracted to repair and restore the canal and aqueducts.