In December 2021 Fortec was engaged by Main Roads to complete the Replacement of Bridge 83 over Sleeman River.
Sleeman River Bridge
Project Overview
Fast Facts
- CLIENTMain Roads WA
- LOCATIONSouth West, WA
Scope of Work
- Drive additional steel piles
- Design & Construction of Precast Planks
- Demolition of existing Bridge in 2 halves
- Construct new abutment widening and new wingwalls
- Backfill behind new abutments and construct road approach tie ins and seal in widening only
- Installation of Precast planks
- Installation of Concrete Topping
- Installation of Guardrail
- Site clean and rehab
Highlights
- Construction of New Bridge Structure
- Alternative Design using Precast Post Tensioned Plank
- Driven Steel Piles