Infrastructure
Bridges
Churchill Road Bridge
Fortec was engaged by Main Roads to complete the widening of the Chruchill Road Bridge in Denmark, WA.
Read moreGeotechnical
Kalbarri Skywalk
Fortec completed the design and construction of passive and active ground retention systems and stressing/load testing of the active permanent ground anchors.
Read moreBridges
Mount St Cable Stay Bridge Project
Fortec was involved in the installation of a new pre-cast concrete mast, new cable stays, and LED feature lighting on the mast and deck.
Read moreGeotechnical
Upper Canal Post-Mining Rehabilitation
Fortec was engaged to perform post-mining rehabilitation works by repairing and restoring the canal and aqueduct on the Upper Canal.
Read morePost Tensioning
Rubyanna WWTP Post Tensioning
Fortec was engaged by Downer Group to provide posttensioning services to Rubyanna Waste Water Treatment Plant.
Read morePost Tensioning
Wellington Dam Anchor Monitoring
Fortec was engaged by the Water Corporation for the monitoring of the anchors to verify the residual force in the anchors after 8 years of service.
Read moreBridges
Yule River Bearing Replacements
Fortec was engaged by Main Roads to utilise our expertise in replacing the existing bridge bearings with new elastomeric bearings.
Read moreGeotechnical
Quarry Amphitheatre Remediation
Fortec was engaged for de-vegetated of the quarry crest as well as installation of steel mesh and geofabric to promote crest stability.
Read moreBridges
MRWA Bridges
Fortec was engaged through Ertech, for the refurbishment to timber bridges 950 and 952 crossing the Swan River at Garratt Road.
Read more