Infrastructure
Post Tensioning
Wellington Dam Anchor Monitoring
Fortec was engaged by the Water Corporation for the monitoring of the anchors to verify the residual force in the anchors after 8 years of service.
Read moreBridges
Yule River Bearing Replacements
Fortec was engaged by Main Roads to utilise our expertise in replacing the existing bridge bearings with new elastomeric bearings.
Read moreGeotechnical
Quarry Amphitheatre Remediation
Fortec was engaged for de-vegetated of the quarry crest as well as installation of steel mesh and geofabric to promote crest stability.
Read moreGeotechnical
Marmion Angling Club
Fortec was engaged by Ertech to perform the soil nail installation for the City of Joondalup at the Marmion Angling and Aquatic Club.
Read morePost Tensioning
Cunderdin Water Tanks Construction
Fortec was engaged by BGC Construction to design the 2NO 37.5ML pre-cast post tensioned tanks and install post tensioning to the two tanks.
Read morePost Tensioning
Coopers Shoot Water Tank
Fortec was engaged to supply and install post tensioning services to a new reservoir at Coopers Shoot and Bangalow, located in Byron Bay.
Read moreBridges
Construction of Bridge 3528A Coolup
Fortec was engaged by BMD Constructions to perform the launching works including supply of launching bearings for the replacement of the bridge.
Read morePost Tensioning
Beenyup WTP Tanks Post Tensioning
Fortec was engaged by D&Z Constructions to design the concrete base and walls and supply and install post tensioning services to 2 new 13.7ML tanks at the Beenyup WTP.
Read more