Infrastructure
Bridges
Construction of Bridge 3528A Coolup
Fortec was engaged by BMD Constructions to perform the launching works including supply of launching bearings for the replacement of the bridge.
Read morePost Tensioning
Beenyup WTP Tanks Post Tensioning
Fortec was engaged by D&Z Constructions to design the concrete base and walls and supply and install post tensioning services to 2 new 13.7ML tanks at the Beenyup WTP.
Read more