Geotechnical
Geotechnical
River Street, Bassendean
Fortec was engaged by VGD Group to carry out a design and construction package to remedy their existing slope failure.
Read moreGeotechnical
Kalbarri Skywalk
Fortec completed the design and construction of passive and active ground retention systems and stressing/load testing of the active permanent ground anchors.
Read moreGeotechnical
Upper Canal Post-Mining Rehabilitation
Fortec was engaged to perform post-mining rehabilitation works by repairing and restoring the canal and aqueduct on the Upper Canal.
Read moreAQWEST Technical School Reservoir
Fortec was engaged to perform micro fine cement grouting works as part of their Tech Reservoir Refurbishment Stage 3.
Read moreGeotechnical
Rockys Reward Drape Mesh Installation
Fortec were engaged to install drape mesh to the north wall of the Rockys Reward pit in Leinster, WA.
Read moreGeotechnical
Quarry Amphitheatre Remediation
Fortec was engaged for de-vegetated of the quarry crest as well as installation of steel mesh and geofabric to promote crest stability.
Read moreGeotechnical
Marmion Angling Club
Fortec was engaged by Ertech to perform the soil nail installation for the City of Joondalup at the Marmion Angling and Aquatic Club.
Read moreGeotechnical
Fimiston Crusher Wing Wall
Fortec carried out important remediation works to the existing area 10 crusher wall at Fimiston Plant for KCGM.
Read moreGeotechnical
Fairbairn Dam Spillway Improvement
Fortec was engaged by Sunwater to undertake drilling, grouting and installing of anchors as part of the Fairbairn Dam Spillway Improvement Project.
Read more