Geotechnical

Geotechnical

River Street, Bassendean

Fortec was engaged by VGD Group to carry out a design and construction package to remedy their existing slope failure.
Read more
Geotechnical

Kalbarri Skywalk

Fortec completed the design and construction of passive and active ground retention systems and stressing/load testing of the active permanent ground anchors.
Read more
Geotechnical

Upper Canal Post-Mining Rehabilitation

Fortec was engaged to perform post-mining rehabilitation works by repairing and restoring the canal and aqueduct on the Upper Canal.
Read more
Geotechnical

AQWEST Technical School Reservoir

Fortec was engaged to perform micro fine cement grouting works as part of their Tech Reservoir Refurbishment Stage 3.
Read more
Geotechnical

Rockys Reward Drape Mesh Installation

Fortec were engaged to install drape mesh to the north wall of the Rockys Reward pit in Leinster, WA.
Read more
Geotechnical

Quarry Amphitheatre Remediation

Fortec was engaged for de-vegetated of the quarry crest as well as installation of steel mesh and geofabric to promote crest stability.
Read more
Geotechnical

Marmion Angling Club

Fortec was engaged by Ertech to perform the soil nail installation for the City of Joondalup at the Marmion Angling and Aquatic Club.
Read more
Geotechnical

Fimiston Crusher Wing Wall

Fortec carried out important remediation works to the existing area 10 crusher wall at Fimiston Plant for KCGM.
Read more
Geotechnical

Fairbairn Dam Spillway Improvement

Fortec was engaged by Sunwater to undertake drilling, grouting and installing of anchors as part of the Fairbairn Dam Spillway Improvement Project.
Read more