Geotechnical

Geotechnical

Cloudbreak Mine

Fortec was contracted by FMG to complete the design and construction of an existing Reinforced Earth segmental wall.
Read more
Geotechnical

Chifley Dam Load Monitoring

Fortec was engaged to complete the load monitoring for 22 anchors within the Spillway chute of Ben Chifley Dam, The Lagoon.
Read more
Geotechnical

Baldivis Pump Station

Fortec was engaged by BMD to supply and install 22 vertical permanent micropiles at the Baldivis Pump Station.
Read more
Geotechnical

Tom Price Minesite

Fortec was engaged to supply and install all of the materials necessary to grout the decant outlet pipework.
Read more
Geotechnical

Riverside Road Fremantle

Fortec was engaged by Fulton Hogan for the anchor replacement and shotcrete batter protection in Fremantle, Western Australia.
Read more
Geotechnical

Delta Corporation

Fortec was engaged by Delta Corporation to carry out the supply, installation, stressing and testing of 16 No 1000kN WL active permanent hold down anchors and pressure grouting.
Read more
Geotechnical

Exit 41 Pacific Motorway

Fortec was contracted by Ertech to carry out the installation and testing of temporary and permanent soil nails and supply, placement and finishing of shotcrete.
Read more
Geotechnical

Rio Tinto West Angeles Mine Site

Fortec was contracted by Austral/Rio Tinto to carry out the installation and testing of permanent soil nails and supply, placement and to strengthen existing ROM Wall to enable upgrading of ROM and mine.
Read more
Geotechnical

Davis Street Underpass 9098

Fortec was contracted by Tonkin Gap Alliance to carry out the temporary foundation improvement of the abutment of an existing underpass.
Read more