Resources
Bridges
Kununurra Diversion Dam
Fortec was engaged by the Water Corporation to install new lifting points to the Kununurra Diversion Dam removable deck beams.
Read moreGeotechnical
Cloudbreak Mine
Fortec was contracted by FMG to complete the design and construction of an existing Reinforced Earth segmental wall.
Read moreGeotechnical
Chifley Dam Load Monitoring
Fortec was engaged to complete the load monitoring for 22 anchors within the Spillway chute of Ben Chifley Dam, The Lagoon.
Read moreGeotechnical
Baldivis Pump Station
Fortec was engaged by BMD to supply and install 22 vertical permanent micropiles at the Baldivis Pump Station.
Read moreGeotechnical
Tom Price Minesite
Fortec was engaged to supply and install all of the materials necessary to grout the decant outlet pipework.
Read moreGeotechnical
Riverside Road Fremantle
Fortec was engaged by Fulton Hogan for the anchor replacement and shotcrete batter protection in Fremantle, Western Australia.
Read moreGeotechnical
Rio Tinto West Angeles Mine Site
Fortec was contracted by Austral/Rio Tinto to carry out the installation and testing of permanent soil nails and supply, placement and to strengthen existing ROM Wall to enable upgrading of ROM and mine.
Read moreAQWEST Technical School Reservoir
Fortec was engaged to perform micro fine cement grouting works as part of their Tech Reservoir Refurbishment Stage 3.
Read moreGeotechnical
Rockys Reward Drape Mesh Installation
Fortec were engaged to install drape mesh to the north wall of the Rockys Reward pit in Leinster, WA.
Read more