Infrastructure
Bridges
Arthur River Bridge
Fortec was engaged by MRWA in May 2022 to conduct extended improvement works to Bridge 4016 over the Arthur River.
Read moreGeotechnical
Exit 41 Pacific Motorway
Fortec was contracted by Ertech to carry out the installation and testing of temporary and permanent soil nails and supply, placement and finishing of shotcrete.
Read moreGeotechnical
Davis Street Underpass 9098
Fortec was contracted by Tonkin Gap Alliance to carry out the temporary foundation improvement of the abutment of an existing underpass.
Read moreBridges
McFarland Bridge Rehabilitation
Fortec was contracted by the Ipswich City Council to complete the remediation works to the existing McFarland bridge located in Grandchester, Queensland.
Read morePost Tensioning
Captains Flat Dam Load Monitoring
Fortec carried the monitoring of the anchors, as part of the periodic monitoring carried out every 10 years as per Dam safety requirements.
Read moreBridges
Cooranbong Bridge
Fortec was engaged by LMCC to strengthen, and undertake upgrade works for the Cooranbong Bridge crossing over Dora Creek.
Read moreBridges
Coalseam Road Bridge
Fortec was engaged by MRWA to demolish the existing Coalseam Road Bridge and construct a new 2 span concrete bridge in its place.
Read moreBridges
Sleeman River Bridge
Fortec was engaged by Main Roads to complete the Replacement of Bridge 83 over Sleeman River.
Read morePost Tensioning
Collie River Suspension Bridge
Fortec was engaged by DBCA to design and construct a suspension footbridge over the Collie River in Western Australia.
Read more